Zixi Broadcaster/ZEC v18 Docum...
...
Broadcaster - Error and Troubl...
Replacing Zixi Hardware in active cluster with Pinned Objects
3 min
procedure to replace a zixi broadcaster (hardware) in a active broadcaster cluster that has “pinned” sources, channels and targets pre requisites within reason, execute the following remove as many of the services as possible off of the zixi broadcaster that is to be replaced take note and copy all the network, naming and password information from the broadcaster that is to be replaced export the configuration file go to the settings tab export export configuration file install hardware if there is room in the data center or specific rack location, install your replacement server prewire the server with the appropriate nics and available switch ports preset to mirror the port configs of the server to be replaced load your preferred os and zixi bx software, using the same version as on the server to be replaced zen master login to zen master targets go to the ‘target’ tab, filter targets by the name of the broadcaster that is to be replaced filter by broadcaster screenshot
